Warehouse Racks in Holland, MI
We design, quote and install new pallet racks in Holland for manufacturing reserve and finished goods. Our warehouse racking plans start with measured clear height, so every beam level fits the loads and lift truck. Holland is about 55 miles northwest, near the Lake Michigan shore. Trucks reach it on US-31 and I-196.
Its warehouse stock is mostly mid-height manufacturing space, which means pallet racking has to be sized carefully to the clear height rather than assumed.
Sizing Pallet Racks to Holland’s 21–27 ft Clear Buildings
Typical Holland buildings run about 21.5 to 27 ft clear. A 1991 airport-area building, for example, sits at 22 ft clear with 40 x 50 ft columns; newer South Holland builds come in at 24–27 ft.
At 22 ft, three beam levels plus the floor is common. At 27 ft, a fourth pallet rack level may fit if the loads are short. We work it out from your tallest pallet, not a rule of thumb.
Warehouse Racking for Local Industrial Areas
The South Holland industrial park sits at Waverly Road and E. 48th Street. The Industrial Airport Overlay District runs next to West Michigan Regional Airport.
On the north side, the corridor near US-31 and 128th Avenue in Holland Township is home to automation, consumer-health and battery manufacturers.
Battery, Automation and Consumer-Health Plants
The north-side manufacturers near US-31 and 128th Avenue have very different storage needs. Battery makers handle dense, heavy components. Automation builders store a wide range of parts in small quantities. Consumer-health producers carry many SKUs in finished cases.
Heavy components get beams sized level by level from real weights. Small-quantity parts suit shelving-style rack or carton flow. Consumer-health cases go in selective bays with carton flow pick faces below.
In every case, the 21–27 ft clear range decides how many levels you get, so we start there.
Carton Flow for Assembly-Line Feed
Manufacturers in these parks often need parts delivered to the line, not just stored. Carton flow rack loads bins from the aisle side and presents them to the operator on the line side.
Empty-tote return lanes can be built into the same unit, so material handlers restock and collect empties in one trip.
Pallet Racking for Reserve Behind the Line
Behind the line, selective pallet rack holds reserve and finished goods. Pallet rack systems are laid out against the 40 x 50 ft grid so posts fall in flue spaces, not in the middle of a bay.
Lake-effect snow is part of Holland winters, so we plan deliveries and install crews around the forecast.
Quote a Holland Project
Or call (269) 390-9036.
Holland Rack FAQs
Planning Racking in Holland?
Call (269) 390-9036 for a free layout.